| 2026 opening | Hachimantai Aspite Line: Wed, April 15, 2026, 10:00. For the Hachimantai Jukai Line, the Tono Onsen to Mikaeri Pass section was announced as planned for Fri, April 24, 2026, 10:00 |
|---|---|
| 2027 | The 2027 opening date had not been announced as of November 17. A facility's road information says the Aspite Line is "closed for winter until next spring, April 15" and the Jukai Line "until next spring, April 22" |
| Open season | Mid-April to early November. The road may be closed when there is a risk of freezing |
| Night | In 2026, closed from 17:00 to 8:30 the next morning for a while after opening |
| Length | About 27 km in total |
| Inquiries | Hachimantai City Tourism Association 0195-78-3500 |
Stay nearby
See all 15 places nearby ›Opening date and how to read this season
According to the Iwate Tourism Association, the Hachimantai Aspite Line, closed in winter, reopens in mid-April, and several meters of snow remain on both sides of the road, forming the snow corridor. In 2026 it opened on Wednesday, April 15 at 10:00, and the same notice said the date may change depending on the weather.
The 2027 opening date had not been announced as of November 17. Hachimantai Resort, which runs the Hachimantai Mountain Hotel, lists on its road information page (updated November 17) that the Aspite Line has been closed since November 4 at 17:00 "until next spring, April 15" and the Jukai Line "until next spring, April 22". Before you go, confirm the actual opening date with the Hachimantai City Tourism Association (0195-78-3500).
The snow corridor
The Aspite Line is a drive of about 27 km that crosses Hachimantai and runs across the border between two prefectures. The Iwate Tourism Association explains that just after the mid-April opening, several meters of snow remain on both sides, forming the snow corridor.
The road is open from mid-April to early November. That means the snow corridor can be driven only for a limited time after opening, and the road can close because of weather or icy surfaces.
Night closures and what to watch
A facility's road notice about 2026's opening said the road would be closed at night (17:00 to 8:30 the next morning) for a while after it opened. The 2027 night arrangement had not been announced, so confirm with the tourism association before you set your departure and return times.
Hachimantai in mid-April still has snow, and the surface can freeze. Prepare for snowy roads, such as winter tires. On the day, the Iwate road information linked from the Hachimantai City Tourism Association site shows current conditions.
Where to stay
The Iwate-side entrance is toward Matsuo-yoriki and the Midorigaoka gate in Hachimantai City. Staying around Matsuo or the Hachimantai Onsen area makes it easier to move in time with the morning opening.
Because of the night closure, there are days when you would have to turn back on the mountain road in the evening. While the open hours are limited, choose a place from which you can leave in the morning and be back by evening, which leaves some time to spare.
Places to stay nearby
- Asu base Yuge0.0 km awaySee prices ›
- Pension Hinode0.0 km awaySee prices ›
- Kyampasu No Mori campus forest hachimantai0.0 km awaySee prices ›
- Kubota Lodge Hachimantai0.0 km awaySee prices ›
- Tsugumino Mori Ittogashi Setsu0.0 km awaySee prices ›
- Pension Arufua0.0 km awaySee prices ›
- Pension Palette0.0 km awaySee prices ›
- Pension Ramu0.0 km awaySee prices ›
- Zen 4 Shitsu No Chiisa Na Yado Beaver0.0 km awaySee prices ›
- Hachimantai LODGE Club Man0.0 km awaySee prices ›
- Hachimantai OLDWOOD0.0 km awaySee prices ›
- Hachimantai Heights0.0 km awaySee prices ›
- Hachimantai Mountain Hotel0.0 km awaySee prices ›
- Hachimantai Rising Sun Hotel0.0 km awaySee prices ›
- Hachimantai Onsen Sato Pension Ramu0.0 km awaySee prices ›